LABORATORIUM | ||
---|---|---|
Tanggal | Judul Training | Harga |
5-6 | Implementasi SNI ISO/IEC 17025:2008 | Rp3,700,000 |
5-6 | Teknik Kalibrasi Suhu (Termometer) | Rp4,000,000 |
5-6 | Teknik Analisis Spektrofotometri Serapan Atom (AAS) Flame | Rp4,500,000 |
5-6 | Kaji Ulang Manajemen dan Pengendalian Sistem Laboratorium | Rp4,000,000 |
5-6 | Verifikasi dan Validasi Metode Uji Kimia | Rp4,000,000 |
6-7 | Teknik Kalibrasi Listrik (Frequency Counter & Function Generator) | Rp4,000,000 |
6-7 | Estimasi Ketidakpastian Pengukuran Analisis Kimia | Rp4,000,000 |
7-8 | Dokumentasi SNI ISO/IEC 17025:2008 | Rp3,700,000 |
7-8 | Teknik Kalibrasi Tekanan (Pressure Gauge Analog Oil/Pneumatic) | Rp4,000,000 |
7-8 | Teknik Analisis Scanning Electron Microscope (SEM) | Rp4,500,000 |
7-8 | Pengendalian Alat dan Bahan Kimia di Laboratorium | Rp4,000,000 |
12-13 | Internal Audit SNI ISO/IEC 17025:2008 | Rp3,700,000 |
12-13 | Teknik Kalibrasi Suhu (Termohigrometer) | Rp4,000,000 |
12-13 | Teknik Analisis Kromatografi Cair Kinerja Tinggi (HPLC) | Rp4,500,000 |
12-13 | Uji Profisiensi Laboratorium (SNI-ISO/IEC 17043-2010) | Rp4,000,000 |
12-13 | Manajemen Peralatan Lab & Evaluasi Performa Alat ukur | Rp4,000,000 |
13-14 | Sistem Pengukuran dan Kalibrasi | Rp4,000,000 |
13-14 | Teknik Kalibrasi Listrik (Insulation Tester & Withstanding Voltage) | Rp4,000,000 |
14-15 | Implementasi SNI ISO 15189:2009 | Rp3,700,000 |
14-15 | Quality Assurance Laboratorium | Rp4,000,000 |
14-15 | Estimasi Ketidakpastian Pengukuran pada Analisis Kromatografi | Rp4,000,000 |
14-15 | Estimasi Ketidakpastian Pengukuran Hasil Kalibrasi | Rp4,000,000 |
19-20 | Internal Audit SNI ISO 15189:2009 | Rp3,700,000 |
19-20 | Teknik Kalibrasi Gaya (Proving Ring) | Rp4,000,000 |
19-20 | Teknik Kalibrasi pH Meter | Rp4,000,000 |
19-20 | Teknik Analisis Kromatografi Gas (GC) | Rp4,500,000 |
20-21 | Dokumentasi ISO/IEC 17020:2012 | Rp3,700,000 |
20-21 | Sistem Pengukuran Air dengan Flowmeter | Rp4,500,000 |
20-21 | Kalibrasi, Verifikasi dan Troubleshooting pada GC | Rp4,000,000 |
21-22 | Sistem Manajemen Informatika Laboratorium | Rp4,000,000 |
21-22 | Teknik Analisis Inductively Coupled Plasma (ICP) OES | Rp4,500,000 |
26-27 | Teknik Kalibrasi Massa (Timbangan) | Rp4,000,000 |
26-27 | Teknik Analisis Spektrofotometri UV-Vis | Rp4,000,000 |
26-27 | Verifikasi dan Validasi Metode Kromatografi Gas (GC) | Rp4,000,000 |
27-28 | Sistem Pengukuran Minyak dengan Flowmeter | Rp4,500,000 |
27-28 | Penanganan Bahan Acuan Bersertifikat (CRM) | Rp4,000,000 |
28-29 | Teknik Analisis Data di Laboratorium | Rp4,000,000 |
28-29 | Teknik Kalibrasi Listrik (Multimeter & RF Power Meter) | Rp4,000,000 |
28-29 | Teknik Analisis IC (Ion Chromatography) | Rp4,500,000 |
QUALITY & PRODUCTION | ||
Tanggal | Judul Training | Harga |
5-6 | Implementasi ISO 9001:2015 | Rp3,500,000 |
5-6 | Total Quality Management (TQM) | Rp4,000,000 |
5-6 | Statistical Process Control & Capability Analysis with MS EXCEL | Rp3,700,000 |
5-6 | Pengolahan dan Analisis Data Kegagalan | Rp5,000,000 |
5-6 | Manufacturing Performance Indicator | Rp4,000,000 |
6-7 | HORENSO (Houkoku-Renraku-Soudan) Japanese Communication System | Rp3,700,000 |
7-8 | Implementasi ISO 9001 + IWA 2 | Rp3,500,000 |
7-8 | Dokumentasi ISO 9001:2015 | Rp3,500,000 |
7-8 | Acceptance Sampling Plan (ISO 2859, MIL STD 105E & 414) | Rp4,000,000 |
7-8 | Product Development with APQP and PPAP | Rp4,000,000 |
7-8 | Business Process Reengineering | Rp3,700,000 |
12-13 | Statistical Process Control & Capability Analysis with MINITAB | Rp3,700,000 |
12-13 | Basic of Project Management | Rp4,000,000 |
13-14 | Maintenance Priority Index (MPI) dengan Proses SERP (Sistem & Equipment Reliability & Prioritization) | Rp4,000,000 |
14-15 | Internal Audit ISO 9001:2015 | Rp3,500,000 |
14-15 | Implementasi 5S (Seiro, Seiton, Seiso, Seiketsu, Shitsuke) | Rp3,700,000 |
14-15 | Measurement System Analysis (MSA) with MINITAB | Rp4,000,000 |
14-15 | Project Risk Management | Rp4,000,000 |
19-20 | Integrasi Sistem Manajemen ISO 9001, ISO 14001 & OHSAS 18001 (Sistem PAS 99) | Rp3,700,000 |
19-20 | Acceptance Sampling Plan (ASQ) | Rp4,000,000 |
19-20 | Design of Experiment (DoE) | Rp4,000,000 |
20-21 | 5S Toyota Production Systems (KAIZEN) | Rp4,000,000 |
20-21 | Implementasi 6S (5S + Safety) | Rp3,700,000 |
21-22 | Six Sigma Quality Using R (Open Source Software) | Rp4,000,000 |
21-22 | Design of Experiment (DoE) for Pharmaceutical | Rp4,000,000 |
21-22 | Teknik Pengendalian Korosi | Rp3,700,000 |
26-27 | Manajemen Pemeliharaan Peralatan Industri Berbasis Komputer (CMMS) | Rp4,000,000 |
28-29 | Teknik Menyusun Standard Operating Procedure (SOP) | Rp3,500,000 |
28-29 | Failure Analysis with Fault Tree Analysis (FTA) & Root Cause Failure Analysis (RCFA) | Rp4,000,000 |
28-29 | Lean Manufacturing | Rp3,700,000 |
MACHINE & ELECTRICAL ENGINEERING | ||
Tanggal | Judul Training | Harga |
5-6 | Implementasi SCADApada Instalasi Industri | Rp4,000,000 |
5-6 | Combustion and Burner | Rp4,000,000 |
5-6 | Diesel Electrical Set Operation and Maintenance | Rp4,000,000 |
6-8 | Industrial Electrical Installations | Rp5,500,000 |
6-8 | Electrical Safety and Power System Protection | Rp5,500,000 |
12-13 | Hydraulic Power System | Rp4,000,000 |
12-13 | Low Voltage Systems and Equipment (Operation And Maintenance) | Rp4,000,000 |
12-13 | Electrical Distribution System Protection | Rp4,000,000 |
12-14 | STEAM BOILERS (Operation, maintenance and troubleshooting) | Rp5,500,000 |
12-14 | Electric Power Transformer and Motor (Operation, Maintenance and Trouble Shooting) | Rp5,500,000 |
14-15 | Basic Power System Protections | Rp4,000,000 |
19-20 | Electrical Safety System | Rp4,000,000 |
19-20 | Low Voltage Equipment and Switchgear (Operation and Maintenance) | Rp4,000,000 |
19-21 | DYNAMIC PUMPS (Operation, Maintenance and Trouble Shooting) | Rp5,500,000 |
19-21 | Power Generation and Electrical Power Distribution | Rp5,500,000 |
19-21 | Safety Instrument System & Control | Rp5,500,000 |
19-21 | Lightning Protection and Grounding Systems | Rp5,500,000 |
20-22 | Power and Distribution Transformers (Operation and Maintenance) | Rp5,500,000 |
21-22 | Pipeline (Testing, Inspection and Maintenance) | Rp4,000,000 |
21-22 | Keselamatan dan Kesehatan Kerja (K3) Listrik | Rp4,000,000 |
21-22 | Basic Geothermal System, Mechanical and Electrical Aspects | Rp4,000,000 |
21-22 | Protection on Generators, Transformers and Networks | Rp4,000,000 |
26-27 | Electrical Power Distribution Networks and Controls | Rp4,000,000 |
26-27 | Electrical Diesel Generator (Operation And Maintenance) | Rp4,000,000 |
27-29 | INDUSTRIAL GAS TURBINES (Operation, Maintenance and Troubleshooting) | Rp5,500,000 |
27-29 | High Voltage Systems and Equipment (Operation and Maintenance) | Rp5,500,000 |
27-29 | Electrical Instruments, Meters and Indicators | Rp5,500,000 |
28-29 | Electrical Selection In Hazardous Area for Offshore Facilities | Rp4,000,000 |
28-29 | Instrumentation and Control on Generators and Turbines | Rp4,000,000 |
SUPPLY CHAIN | ||
Tanggal | Judul Training | Harga |
5-6 | Supplier Market Analysis | Rp3,700,000 |
5-6 | Dispatch Management System | Rp4,000,000 |
7-8 | RFID in Warehouse | Rp4,000,000 |
7-8 | Fundamental of Supply Chain Management & Logistic | Rp3,700,000 |
12-13 | Basic of Purchasing Management | Rp3,700,000 |
12-13 | Production Planning and Inventory Control (PPIC) | Rp4,000,000 |
14-15 | Reverse Logistics | Rp4,000,000 |
14-15 | Manajemen Transportasi | Rp4,000,000 |
19-20 | Effective Inventory Reduction | Rp4,000,000 |
19-20 | Vendor Management Inventory | Rp4,000,000 |
19-20 | Vendor Analysis and Selection | Rp4,000,000 |
21-22 | Owner Estimate Technique | Rp4,000,000 |
21-22 | Spare Part Management | Rp4,000,000 |
26-27 | Basic of Inventory Management & Warehouse Management | Rp3,700,000 |
26-27 | Negotiation Skills | Rp4,000,000 |
26-27 | Change Management in SCM | Rp4,000,000 |
26-27 | Continous Improvement Supply Chain dengan Simulasi Promodel | Rp4,000,000 |
28-29 | Driver Management | Rp4,000,000 |
28-29 | Competitor Market Analysis | Rp4,000,000 |
HEALTH, SAFETY & ENVIRONTMENT | ||
Tanggal | Judul Training | Harga |
5-6 | Implementasi ISO 14001:2015 | Rp3,700,000 |
5-6 | Pengendalian Bahan Beracun Berbahaya (B3) | Rp4,000,000 |
5-6 | Teknik Penyusunan AMDAL | Rp4,000,000 |
5-6 | Behaviour Safety | Rp4,000,000 |
5-6 | Hazard Communication | Rp4,000,000 |
7-8 | Dokumentasi ISO 14001:2015 | Rp3,700,000 |
7-8 | Industrial Disaster & Emergency Response | Rp4,000,000 |
7-8 | Incident Investigation | Rp4,000,000 |
7-8 | Pengelolaan Limbah Biologis | Rp4,000,000 |
12-13 | Implementasi OHSAS 18001:2007 | Rp3,700,000 |
12-13 | Internal Audit ISO 14001:2015 | Rp3,700,000 |
12-13 | Green Building and Factory | Rp4,000,000 |
12-13 | Teknik Penanganan Kondisi Tanggap darurat | Rp4,000,000 |
12-13 | Process Hazard Analysis Leader | Rp4,000,000 |
13-14 | Pengelolaan Limbah Industri | Rp4,000,000 |
14-15 | Dokumentasi OHSAS 18001:2007 | Rp3,700,000 |
14-15 | Hazard Operational (HAZOP) | Rp4,000,000 |
19-20 | Audit Internal OHSAS 18001:2007 | Rp3,700,000 |
19-20 | Risk Assessment (Analisa Resiko) & JSA (Job Safety Analysis) | Rp4,000,000 |
20-21 | Ergonomic In Workplace | Rp3,700,000 |
21-22 | Implementasi Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3 - PP No 50 Tahun 2012) | Rp3,700,000 |
26-27 | Teknik Instalasi Pengolahan Air Limbah (IPAL) | Rp4,000,000 |
27-28 | Persiapan Audit Lingkungan (PROPER) | Rp4,000,000 |
28-29 | Teknik Penyusunan dan Pemahaman MSDS | Rp4,000,000 |
28-29 | Implementasi ISO 14064:2006 (Perhitungan dan Penurunan Emisi Gas Rumah Kaca) | Rp4,000,000 |
FINANCE | ||
Tanggal | Judul Training | Harga |
6-7 | Advanced Budgeting and Cost Control | Rp3,700,000 |
14-15 | Financial Planning & Decision Making | Rp3,700,000 |
19-20 | Finance for Non Finance | Rp3,700,000 |
21-22 | Activity Based Costing | Rp3,700,000 |
21-22 | Budgeting and Project Cost Control | Rp3,700,000 |
26-27 | Export Import | Rp3,700,000 |
28-29 | Cash Management | Rp3,700,000 |
MARKETING | ||
Tanggal | Judul Training | Harga |
5-6 | Customer Satisfaction Survey (Methodology & Statistic) | Rp4,500,000 |
12-13 | Marketing Research with SPSS | Rp4,500,000 |
14-15 | Marketing Research with MS Excel | Rp4,500,000 |
19-20 | Advance Statistical Analysis For Marketing Research Using R (Open Source Software) | Rp4,500,000 |
HRD | ||
Tanggal | Judul Training | Harga |
6-7 | Fast Track To Be A Super Supervisor | Rp3,800,000 |
7-8 | Performance Management and Appraisal | Rp3,800,000 |
12-13 | HR for Non HR | Rp3,800,000 |
14-15 | Effective Customer Relationship Management (CRM) | Rp3,800,000 |
14-15 | Program Persiapan Pensiun | Rp3,800,000 |
19-20 | Handling Customer Complaint | Rp3,800,000 |
19-20 | Training Need Analysis | Rp3,800,000 |
20-21 | Human Capital Return on Investment | Rp3,800,000 |
21-22 | Corporate Social Responsibility (CSR) | Rp3,800,000 |
21-22 | Statistical Performance Control for Employee | Rp3,800,000 |
26-27 | Work Load Analysis | Rp3,800,000 |
26-27 | Design & Evaluation of Training Program | Rp3,800,000 |
28-29 | HR Management Based Competency | Rp3,800,000 |
28-29 | Competency Based Recruitment & Selection | Rp3,800,000 |
28-29 | Hukum Ketenagakerjaan | Rp3,800,000 |
MINING, OIL & GAS | ||
Tanggal | Judul Training | Harga |
5-6 | Teknologi Gasifikasi Batubara dan Penerapannya | Rp5,000,000 |
7-8 | Teknologi Pemanfaatan Batubara untuk PLTU | Rp5,000,000 |
14-15 | Teknik Preparasi, Pengujian dan Analisis Batubara | Rp5,000,000 |
19-20 | Coal Preparation Plant & Stockpile Management | Rp5,000,000 |
19-21 | Pengenalan Proses Preparasi Analisis Bahan Galian Industri dan Bahan Galian Logam | Rp5,500,000 |
21-22 | Teknologi Batubara Bersih | Rp5,000,000 |
28-29 | Teknologi Upgrading Batubara | Rp5,000,000 |
FOOD & AGRICULTURE | ||
Tanggal | Judul Training | Harga |
5-6 | Food Safety (HACCP) For Hotel, Restaurant & Catering | Rp4,000,000 |
6-7 | Good Manufacturing Practice: Cara Pengolahan Pangan yang Baik | Rp3,700,000 |
7-8 | Implementasi ISO 22000:2005 | Rp3,700,000 |
12-13 | Internal Audit ISO 22000:2005 | Rp3,700,000 |
19-20 | Penentuan Kadaluarsa Produk Pangan | Rp3,700,000 |
20-21 | GAP & GHP (Good Agriculture Practice & Good Handling Practice) | Rp4,000,000 |
21-22 | Dokumentasi ISO 22000:2005 | Rp3,700,000 |
28-29 | Pelatihan Operator Pertanian Organik | Rp3,700,000 |
CIVIL & CONTRUCTION | ||
Tanggal | Judul Training | Harga |
5-6 | Pengendalian Mutu Pekerjaan Beton Semen dan Perencanaan Campuran (Mix Design) | Rp4,500,000 |
12-13 | Pelaksanaan dan Pengendalian Mutu Pekerjaan Timbunan Badan Jalan | Rp4,500,000 |
14-15 | Pelaksanaan dan Pengendalian Mutu Pekerjaan Perkerasan Jalan Lentur (Flexible Pavement) | Rp4,500,000 |
26-27 | Pelaksanaan dan Pemeliharaan Jembatan | Rp4,500,000 |
Pelatihan Karyawan, Pelatihan Manajemen, Manajemen Pelatihan, Pelatihan Leadership, Materi Training, Lembaga Pelatihan, Lembaga Training, Training Hrd, Informasi Training, Jadwal Training, Pelatihan Hrd, Jadwal Pelatihan, Training Hr, Pelatihan Management, Training Untuk Hrd
Kamis, 11 Februari 2016
Jadwal Training Bulan April 2016
Langganan:
Posting Komentar (Atom)
Tidak ada komentar:
Posting Komentar