LABORATORIUM | ||
---|---|---|
Tanggal | Judul Training | Harga |
2-3 | Implementasi SNI ISO/IEC 17025:2008 | Rp3,700,000 |
2-3 | Teknik Analisis Kromatografi Cair Kinerja Tinggi (HPLC) | Rp4,500,000 |
2-3 | Estimasi Ketidakpastian Pengukuran Hasil Kalibrasi | Rp4,000,000 |
3-4 | Teknik Analisis Inductively Coupled Plasma (ICP) OES | Rp4,500,000 |
4-5 | Dokumentasi SNI ISO/IEC 17025:2008 | Rp3,700,000 |
4-5 | Teknik Kalibrasi Listrik (Multimeter & RF Power Meter) | Rp4,000,000 |
4-5 | Teknik Kalibrasi Listrik (Frequency Counter & Function Generator) | Rp4,000,000 |
4-5 | Estimasi Ketidakpastian Pengukuran Analisis Kimia | Rp4,000,000 |
4-5 | Manajemen Peralatan Lab & Evaluasi Performa Alat ukur | Rp4,000,000 |
9-10 | Internal Audit SNI ISO/IEC 17025:2008 | Rp3,700,000 |
9-10 | Teknik Kalibrasi pH Meter | Rp4,000,000 |
9-10 | Sistem Pengukuran Minyak dengan Flowmeter | Rp4,500,000 |
9-10 | Kaji Ulang Manajemen dan Pengendalian Sistem Laboratorium | Rp4,000,000 |
9-10 | Pengendalian Alat dan Bahan Kimia di Laboratorium | Rp4,000,000 |
10-11 | Teknik Analisis Spektrofotometri UV-Vis | Rp4,000,000 |
10-11 | Kalibrasi, Verifikasi dan Troubleshooting pada GC | Rp4,000,000 |
11-12 | Implementasi SNI ISO 15189:2009 | Rp3,700,000 |
11-12 | Teknik Kalibrasi Suhu (Termometer) | Rp4,000,000 |
11-12 | Estimasi Ketidakpastian Pengukuran pada Analisis Kromatografi | Rp4,000,000 |
16-17 | Internal Audit SNI ISO 15189:2009 | Rp3,700,000 |
16-17 | Teknik Kalibrasi Tekanan (Pressure Gauge Analog Oil/Pneumatic) | Rp4,000,000 |
16-17 | Teknik Analisis Kromatografi Gas (GC) | Rp4,500,000 |
16-17 | Uji Profisiensi Laboratorium (SNI-ISO/IEC 17043-2010) | Rp4,000,000 |
16-17 | Verifikasi dan Validasi Metode Uji Kimia | Rp4,000,000 |
17-18 | Dokumentasi ISO/IEC 17020:2012 | Rp3,700,000 |
17-18 | Teknik Kalibrasi Suhu (Termohigrometer) | Rp4,000,000 |
17-18 | Teknik Analisis IC (Ion Chromatography) | Rp4,500,000 |
18-19 | Teknik Analisis Data di Laboratorium | Rp4,000,000 |
18-19 | Teknik Kalibrasi Massa (Timbangan) | Rp4,000,000 |
18-19 | Teknik Kalibrasi Listrik (Insulation Tester & Withstanding Voltage) | Rp4,000,000 |
18-19 | Quality Assurance Laboratorium | Rp4,000,000 |
23-24 | Sistem Pengukuran dan Kalibrasi | Rp4,000,000 |
23-24 | Sistem Pengukuran Air dengan Flowmeter | Rp4,500,000 |
23-24 | Penanganan Bahan Acuan Bersertifikat (CRM) | Rp4,000,000 |
24-25 | Teknik Analisis Scanning Electron Microscope (SEM) | Rp4,500,000 |
25-26 | Sistem Manajemen Informatika Laboratorium | Rp4,000,000 |
25-26 | Teknik Kalibrasi Gaya (Proving Ring) | Rp4,000,000 |
25-26 | Teknik Analisis Spektrofotometri Serapan Atom (AAS) Flame | Rp4,500,000 |
25-26 | Verifikasi dan Validasi Metode Kromatografi Gas (GC) | Rp4,000,000 |
QUALITY & PRODUCTION | ||
Tanggal | Judul Training | Harga |
2-3 | Product Development with APQP and PPAP | Rp4,000,000 |
3-4 | Project Risk Management | Rp4,000,000 |
4-5 | Basic of Project Management | Rp4,000,000 |
4-5 | Manufacturing Performance Indicator | Rp4,000,000 |
5-6 | Implementasi ISO 9001:2015 | Rp3,500,000 |
7-8 | Implementasi ISO 9001 + IWA 2 | Rp3,500,000 |
7-8 | Implementasi 6S (5S + Safety) | Rp3,700,000 |
9-10 | Statistical Process Control & Capability Analysis with MINITAB | Rp3,700,000 |
10-11 | Acceptance Sampling Plan (ISO 2859, MIL STD 105E & 414) | Rp4,000,000 |
11-12 | Pengolahan dan Analisis Data Kegagalan | Rp5,000,000 |
12-13 | Dokumentasi ISO 9001:2015 | Rp3,500,000 |
12-14 | Audit Internal Integrasi Sistem ISO 9001, ISO 14001 & OHSAS 18001 (Based on ISO 19011) | Rp4,500,000 |
14-15 | Zero Defect with Poka Yoke | Rp3,700,000 |
17-18 | Statistical Process Control & Capability Analysis with MS EXCEL | Rp3,700,000 |
17-18 | Measurement System Analysis (MSA) with MINITAB | Rp4,000,000 |
17-18 | Failure Analysis with Fault Tree Analysis (FTA) & Root Cause Failure Analysis (RCFA) | Rp4,000,000 |
17-18 | Lean Manufacturing | Rp3,700,000 |
18-19 | Business Process Reengineering | Rp3,700,000 |
19-20 | Internal Audit ISO 9001:2015 | Rp3,500,000 |
19-20 | Executive Introduction of ISO/TS 16949:2009 | Rp4,000,000 |
21-22 | Document Control | Rp3,700,000 |
21-22 | Executive Awareness of Six Sigma Program | Rp4,000,000 |
23-24 | Acceptance Sampling Plan (ASQ) | Rp4,000,000 |
23-24 | Maintenance Priority Index (MPI) dengan Proses SERP (Sistem & Equipment Reliability & Prioritization) | Rp4,000,000 |
24-25 | Design of Experiment (DoE) for Pharmaceutical | Rp4,000,000 |
25-26 | Six Sigma Quality Using R (Open Source Software) | Rp4,000,000 |
25-26 | Design of Experiment (DoE) | Rp4,000,000 |
25-26 | Manajemen Pemeliharaan Peralatan Industri Berbasis Komputer (CMMS) | Rp4,000,000 |
25-26 | Teknik Pengendalian Korosi | Rp3,700,000 |
26-27 | E-document Management System | Rp3,700,000 |
28-29 | Implementasi 5S (Seiro, Seiton, Seiso, Seiketsu, Shitsuke) | Rp3,700,000 |
MACHINE & ELECTRICAL ENGINEERING | ||
Tanggal | Judul Training | Harga |
2-3 | Hydraulic Power System | Rp4,000,000 |
3-4 | Basic Geothermal System, Mechanical and Electrical Aspects | Rp4,000,000 |
3-5 | INDUSTRIAL GAS TURBINES (Operation, Maintenance and Troubleshooting) | Rp5,500,000 |
3-5 | Industrial Electrical Installations | Rp5,500,000 |
3-5 | Electrical Instruments, Meters and Indicators | Rp5,500,000 |
4-5 | Combustion and Burner | Rp4,000,000 |
4-5 | Low Voltage Systems and Equipment (Operation And Maintenance) | Rp4,000,000 |
9-11 | DYNAMIC PUMPS (Operation, Maintenance and Trouble Shooting) | Rp5,500,000 |
9-11 | Lightning Protection and Grounding Systems | Rp5,500,000 |
10-11 | Electrical Diesel Generator (Operation And Maintenance) | Rp4,000,000 |
11-12 | Basic Power System Protections | Rp4,000,000 |
16-17 | Diesel Electrical Set Operation and Maintenance | Rp4,000,000 |
16-17 | Low Voltage Equipment and Switchgear (Operation and Maintenance) | Rp4,000,000 |
16-17 | Electrical Distribution System Protection | Rp4,000,000 |
16-18 | Power Generation and Electrical Power Distribution | Rp5,500,000 |
16-18 | Safety Instrument System & Control | Rp5,500,000 |
16-18 | Electrical Safety and Power System Protection | Rp5,500,000 |
17-18 | Electrical Safety System | Rp4,000,000 |
17-19 | STEAM BOILERS (Operation, maintenance and troubleshooting) | Rp5,500,000 |
17-19 | Power and Distribution Transformers (Operation and Maintenance) | Rp5,500,000 |
17-19 | Electric Power Transformer and Motor (Operation, Maintenance and Trouble Shooting) | Rp5,500,000 |
18-19 | Electrical Selection In Hazardous Area for Offshore Facilities | Rp4,000,000 |
23-24 | Instrumentation and Control on Generators and Turbines | Rp4,000,000 |
23-25 | High Voltage Systems and Equipment (Operation and Maintenance) | Rp5,500,000 |
25-26 | Implementasi SCADApada Instalasi Industri | Rp4,000,000 |
25-26 | Pipeline (Testing, Inspection and Maintenance) | Rp4,000,000 |
25-26 | Electrical Power Distribution Networks and Controls | Rp4,000,000 |
25-26 | Keselamatan dan Kesehatan Kerja (K3) Listrik | Rp4,000,000 |
25-26 | Protection on Generators, Transformers and Networks | Rp4,000,000 |
SUPPLY CHAIN | ||
Tanggal | Judul Training | Harga |
2-3 | Reverse Logistics | Rp4,000,000 |
2-3 | Manajemen Transportasi | Rp4,000,000 |
3-4 | Owner Estimate Technique | Rp4,000,000 |
4-5 | Basic of Purchasing Management | Rp3,700,000 |
4-5 | Competitor Market Analysis | Rp4,000,000 |
9-10 | Vendor Analysis and Selection | Rp4,000,000 |
10-11 | Fundamental of Supply Chain Management & Logistic | Rp3,700,000 |
10-11 | Negotiation Skills | Rp4,000,000 |
11-12 | Dispatch Management System | Rp4,000,000 |
16-17 | Supplier Market Analysis | Rp3,700,000 |
16-17 | Effective Inventory Reduction | Rp4,000,000 |
16-17 | RFID in Warehouse | Rp4,000,000 |
17-18 | Driver Management | Rp4,000,000 |
17-18 | Production Planning and Inventory Control (PPIC) | Rp4,000,000 |
17-18 | Spare Part Management | Rp4,000,000 |
18-19 | Change Management in SCM | Rp4,000,000 |
18-19 | Continous Improvement Supply Chain dengan Simulasi Promodel | Rp4,000,000 |
25-26 | Basic of Inventory Management & Warehouse Management | Rp3,700,000 |
25-26 | Vendor Management Inventory | Rp4,000,000 |
HEALTH, SAFETY & ENVIRONTMENT | ||
Tanggal | Judul Training | Harga |
2-3 | Implementasi ISO 14064:2006 (Perhitungan dan Penurunan Emisi Gas Rumah Kaca) | Rp4,000,000 |
4-5 | Green Building and Factory | Rp4,000,000 |
4-5 | Risk Assessment (Analisa Resiko) & JSA (Job Safety Analysis) | Rp4,000,000 |
4-5 | Teknik Penanganan Kondisi Tanggap darurat | Rp4,000,000 |
4-5 | Pengelolaan Limbah Biologis | Rp4,000,000 |
5-6 | Implementasi OHSAS 18001:2007 | Rp3,700,000 |
5-6 | Implementasi ISO 14001:2015 | Rp3,700,000 |
5-6 | Globally Harmonized System (GHS)Sistem Klasifikasi dan Pelabelan Bahan Kimia B3 | Rp4,500,000 |
7-8 | Dokumentasi OHSAS 18001:2007 | Rp3,700,000 |
7-8 | Dokumentasi ISO 14001:2015 | Rp3,700,000 |
7-8 | Waste Water Treatment | Rp4,000,000 |
10-11 | Incident Investigation | Rp4,000,000 |
12-13 | Audit Internal OHSAS 18001:2007 | Rp3,700,000 |
12-13 | Safety Risk Management | Rp4,000,000 |
14-15 | Internal Audit ISO 14001:2015 | Rp3,700,000 |
14-15 | Audit dan Manajemen Energi di Industri (Based on ISO 50001:2011) | Rp4,000,000 |
16-17 | Behaviour Safety | Rp4,000,000 |
17-18 | Hazard Operational (HAZOP) | Rp4,000,000 |
18-19 | Pengelolaan Limbah Industri | Rp4,000,000 |
23-24 | Implementasi Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3 - PP No 50 Tahun 2012) | Rp3,700,000 |
23-24 | Process Hazard Analysis Leader | Rp4,000,000 |
23-24 | Persiapan Audit Lingkungan (PROPER) | Rp4,000,000 |
23-24 | Ergonomic In Workplace | Rp3,700,000 |
25-26 | Hazard Communication | Rp4,000,000 |
27-28 | Transportasi Bahan Beracun Berbahaya (B3) | Rp4,000,000 |
FINANCE | ||
Tanggal | Judul Training | Harga |
2-3 | Advanced Budgeting and Cost Control | Rp3,700,000 |
11-12 | Financial Planning & Decision Making | Rp3,700,000 |
16-17 | Finance for Non Finance | Rp3,700,000 |
17-18 | Activity Based Costing | Rp3,700,000 |
18-19 | Cash Management | Rp3,700,000 |
23-24 | Export Import | Rp3,700,000 |
25-26 | Budgeting and Project Cost Control | Rp3,700,000 |
MARKETING | ||
Tanggal | Judul Training | Harga |
9-10 | Customer Satisfaction Survey (Methodology & Statistic) | Rp4,500,000 |
17-18 | Marketing Research with SPSS | Rp4,500,000 |
18-19 | Advance Statistical Analysis For Marketing Research Using R (Open Source Software) | Rp4,500,000 |
25-26 | Marketing Research with MS Excel | Rp4,500,000 |
HRD | ||
Tanggal | Judul Training | Harga |
2-3 | Performance Management and Appraisal | Rp3,800,000 |
3-4 | Corporate Social Responsibility (CSR) | Rp3,800,000 |
4-5 | Fast Track To Be A Super Supervisor | Rp3,800,000 |
9-10 | Effective Customer Relationship Management (CRM) | Rp3,800,000 |
10-11 | Design & Evaluation of Training Program | Rp3,800,000 |
11-12 | HR for Non HR | Rp3,800,000 |
11-12 | Program Persiapan Pensiun | Rp3,800,000 |
16-17 | Handling Customer Complaint | Rp3,800,000 |
16-17 | Training Need Analysis | Rp3,800,000 |
17-18 | Competency Based Recruitment & Selection | Rp3,800,000 |
18-19 | HR Management Based Competency | Rp3,800,000 |
18-19 | Hukum Ketenagakerjaan | Rp3,800,000 |
23-24 | Work Load Analysis | Rp3,800,000 |
25-26 | Human Capital Return on Investment | Rp3,800,000 |
25-26 | Statistical Performance Control for Employee | Rp3,800,000 |
MINING, OIL & GAS | ||
Tanggal | Judul Training | Harga |
2-3 | Teknologi Gasifikasi Batubara dan Penerapannya | Rp5,000,000 |
4-5 | Teknologi Pemanfaatan Batubara untuk PLTU | Rp5,000,000 |
9-11 | Pengenalan Proses Preparasi Analisis Bahan Galian Industri dan Bahan Galian Logam | Rp5,500,000 |
11-12 | Teknik Preparasi, Pengujian dan Analisis Batubara | Rp5,000,000 |
16-17 | Coal Preparation Plant & Stockpile Management | Rp5,000,000 |
18-19 | Teknologi Upgrading Batubara | Rp5,000,000 |
25-26 | Teknologi Batubara Bersih | Rp5,000,000 |
FOOD & AGRICULTURE | ||
Tanggal | Judul Training | Harga |
3-4 | Good Manufacturing Practice: Cara Pengolahan Pangan yang Baik | Rp3,700,000 |
4-5 | Pelatihan Operator Pertanian Organik | Rp3,700,000 |
9-10 | Penentuan Kadaluarsa Produk Pangan | Rp3,700,000 |
10-11 | Implementasi ISO 22000:2005 | Rp3,700,000 |
11-12 | Food Safety (HACCP) For Hotel, Restaurant & Catering | Rp4,000,000 |
16-17 | Dokumentasi ISO 22000:2005 | Rp3,700,000 |
16-17 | GAP & GHP (Good Agriculture Practice & Good Handling Practice) | Rp4,000,000 |
18-19 | Internal Audit ISO 22000:2005 | Rp3,700,000 |
CIVIL & CONTRUCTION | ||
Tanggal | Judul Training | Harga |
9-10 | Pengendalian Mutu Pekerjaan Beton Semen dan Perencanaan Campuran (Mix Design) | Rp4,500,000 |
16-17 | Pelaksanaan dan Pengendalian Mutu Pekerjaan Timbunan Badan Jalan | Rp4,500,000 |
18-19 | Pelaksanaan dan Pengendalian Mutu Pekerjaan Perkerasan Jalan Lentur (Flexible Pavement) | Rp4,500,000 |
23-24 | Pelaksanaan dan Pemeliharaan Jembatan | Rp4,500,000 |
Pelatihan Karyawan, Pelatihan Manajemen, Manajemen Pelatihan, Pelatihan Leadership, Materi Training, Lembaga Pelatihan, Lembaga Training, Training Hrd, Informasi Training, Jadwal Training, Pelatihan Hrd, Jadwal Pelatihan, Training Hr, Pelatihan Management, Training Untuk Hrd
Kamis, 11 Februari 2016
Jadwal Training Bulan Februari 2016
Langganan:
Posting Komentar (Atom)
Tidak ada komentar:
Posting Komentar