LABORATORIUM | ||
---|---|---|
Tanggal | Judul Training | Harga |
1-2 | Implementasi SNI ISO/IEC 17025:2008 | Rp3,700,000 |
1-2 | Teknik Kalibrasi Tekanan (Pressure Gauge Analog Oil/Pneumatic) | Rp4,000,000 |
1-2 | Teknik Kalibrasi Listrik (Frequency Counter & Function Generator) | Rp4,000,000 |
1-2 | Penanganan Bahan Acuan Bersertifikat (CRM) | Rp4,000,000 |
2-3 | Teknik Kalibrasi Listrik (Insulation Tester & Withstanding Voltage) | Rp4,000,000 |
2-3 | Estimasi Ketidakpastian Pengukuran Hasil Kalibrasi | Rp4,000,000 |
7-8 | Dokumentasi SNI ISO/IEC 17025:2008 | Rp3,700,000 |
7-8 | Implementasi SNI ISO 15189:2009 | Rp3,700,000 |
7-8 | Teknik Analisis Kromatografi Cair Kinerja Tinggi (HPLC) | Rp4,500,000 |
7-8 | Estimasi Ketidakpastian Pengukuran Analisis Kimia | Rp4,000,000 |
7-8 | Manajemen Peralatan Lab & Evaluasi Performa Alat ukur | Rp4,000,000 |
8-9 | Uji Profisiensi Laboratorium (SNI-ISO/IEC 17043-2010) | Rp4,000,000 |
9-10 | Internal Audit SNI ISO/IEC 17025:2008 | Rp3,700,000 |
9-10 | Internal Audit SNI ISO 15189:2009 | Rp3,700,000 |
9-10 | Teknik Kalibrasi Suhu (Termometer) | Rp4,000,000 |
9-10 | Teknik Analisis IC (Ion Chromatography) | Rp4,500,000 |
9-10 | Pengendalian Alat dan Bahan Kimia di Laboratorium | Rp4,000,000 |
14-15 | Teknik Kalibrasi Gaya (Proving Ring) | Rp4,000,000 |
14-15 | Teknik Analisis Scanning Electron Microscope (SEM) | Rp4,500,000 |
14-15 | Kalibrasi, Verifikasi dan Troubleshooting pada GC | Rp4,000,000 |
15-16 | Sistem Pengukuran Air dengan Flowmeter | Rp4,500,000 |
16-17 | Dokumentasi ISO/IEC 17020:2012 | Rp3,700,000 |
16-17 | Teknik Kalibrasi Listrik (Multimeter & RF Power Meter) | Rp4,000,000 |
16-17 | Teknik Analisis Kromatografi Gas (GC) | Rp4,500,000 |
16-17 | Verifikasi dan Validasi Metode Kromatografi Gas (GC) | Rp4,000,000 |
21-22 | Teknik Analisis Data di Laboratorium | Rp4,000,000 |
21-22 | Teknik Kalibrasi Suhu (Termohigrometer) | Rp4,000,000 |
21-22 | Teknik Analisis Inductively Coupled Plasma (ICP) OES | Rp4,500,000 |
22-23 | Sistem Pengukuran Minyak dengan Flowmeter | Rp4,500,000 |
22-23 | Estimasi Ketidakpastian Pengukuran pada Analisis Kromatografi | Rp4,000,000 |
23-24 | Sistem Manajemen Informatika Laboratorium | Rp4,000,000 |
23-24 | Teknik Kalibrasi pH Meter | Rp4,000,000 |
23-24 | Quality Assurance Laboratorium | Rp4,000,000 |
23-24 | Verifikasi dan Validasi Metode Uji Kimia | Rp4,000,000 |
28-29 | Sistem Pengukuran dan Kalibrasi | Rp4,000,000 |
28-29 | Kaji Ulang Manajemen dan Pengendalian Sistem Laboratorium | Rp4,000,000 |
29-30 | Teknik Kalibrasi Massa (Timbangan) | Rp4,000,000 |
29-30 | Teknik Analisis Spektrofotometri Serapan Atom (AAS) Flame | Rp4,500,000 |
29-30 | Teknik Analisis Spektrofotometri UV-Vis | Rp4,000,000 |
QUALITY & PRODUCTION | ||
Tanggal | Judul Training | Harga |
1-2 | Implementasi ISO 9001:2015 | Rp3,500,000 |
1-2 | Statistical Process Control & Capability Analysis with MS EXCEL | Rp3,700,000 |
1-2 | Basic of Project Management | Rp4,000,000 |
2-3 | Implementasi ISO 9001 + IWA 2 | Rp3,500,000 |
2-3 | Total Quality Management (TQM) | Rp4,000,000 |
2-3 | Project Risk Management | Rp4,000,000 |
2-3 | Manufacturing Performance Indicator | Rp4,000,000 |
7-8 | Dokumentasi ISO 9001:2015 | Rp3,500,000 |
7-8 | Business Process Reengineering | Rp3,700,000 |
9-10 | Internal Audit ISO 9001:2015 | Rp3,500,000 |
9-10 | Acceptance Sampling Plan (ISO 2859, MIL STD 105E & 414) | Rp4,000,000 |
9-10 | Statistical Process Control & Capability Analysis with MINITAB | Rp3,700,000 |
9-10 | Product Development with APQP and PPAP | Rp4,000,000 |
14-15 | Implementasi 5S (Seiro, Seiton, Seiso, Seiketsu, Shitsuke) | Rp3,700,000 |
14-15 | Design of Experiment (DoE) | Rp4,000,000 |
15-16 | Maintenance Priority Index (MPI) dengan Proses SERP (Sistem & Equipment Reliability & Prioritization) | Rp4,000,000 |
16-17 | Integrasi Sistem Manajemen ISO 9001, ISO 14001 & OHSAS 18001 (Sistem PAS 99) | Rp3,700,000 |
16-17 | Six Sigma Quality Using R (Open Source Software) | Rp4,000,000 |
16-17 | Acceptance Sampling Plan (ASQ) | Rp4,000,000 |
16-17 | Measurement System Analysis (MSA) with MINITAB | Rp4,000,000 |
16-17 | Teknik Pengendalian Korosi | Rp3,700,000 |
21-22 | Teknik Menyusun Standard Operating Procedure (SOP) | Rp3,500,000 |
21-22 | Design of Experiment (DoE) for Pharmaceutical | Rp4,000,000 |
23-24 | Implementasi 6S (5S + Safety) | Rp3,700,000 |
23-24 | Failure Analysis with Fault Tree Analysis (FTA) & Root Cause Failure Analysis (RCFA) | Rp4,000,000 |
23-24 | Manajemen Pemeliharaan Peralatan Industri Berbasis Komputer (CMMS) | Rp4,000,000 |
28-29 | HORENSO (Houkoku-Renraku-Soudan) Japanese Communication System | Rp3,700,000 |
28-29 | Lean Manufacturing | Rp3,700,000 |
29-30 | 5S Toyota Production Systems (KAIZEN) | Rp4,000,000 |
29-30 | Pengolahan dan Analisis Data Kegagalan | Rp5,000,000 |
MACHINE & ELECTRICAL ENGINEERING | ||
Tanggal | Judul Training | Harga |
1-3 | High Voltage Systems and Equipment (Operation and Maintenance) | Rp5,500,000 |
7-8 | Hydraulic Power System | Rp4,000,000 |
7-8 | Low Voltage Systems and Equipment (Operation And Maintenance) | Rp4,000,000 |
7-9 | Industrial Electrical Installations | Rp5,500,000 |
7-9 | Electrical Safety and Power System Protection | Rp5,500,000 |
8-10 | Power Generation and Electrical Power Distribution | Rp5,500,000 |
8-10 | Safety Instrument System & Control | Rp5,500,000 |
9-10 | Combustion and Burner | Rp4,000,000 |
9-10 | Basic Power System Protections | Rp4,000,000 |
15-17 | INDUSTRIAL GAS TURBINES (Operation, Maintenance and Troubleshooting) | Rp5,500,000 |
15-17 | Power and Distribution Transformers (Operation and Maintenance) | Rp5,500,000 |
15-17 | Electrical Instruments, Meters and Indicators | Rp5,500,000 |
16-17 | Electrical Power Distribution Networks and Controls | Rp4,000,000 |
16-17 | Low Voltage Equipment and Switchgear (Operation and Maintenance) | Rp4,000,000 |
16-17 | Instrumentation and Control on Generators and Turbines | Rp4,000,000 |
16-17 | Electrical Distribution System Protection | Rp4,000,000 |
21-22 | Pipeline (Testing, Inspection and Maintenance) | Rp4,000,000 |
21-22 | Electrical Selection In Hazardous Area for Offshore Facilities | Rp4,000,000 |
21-22 | Basic Geothermal System, Mechanical and Electrical Aspects | Rp4,000,000 |
21-22 | Protection on Generators, Transformers and Networks | Rp4,000,000 |
21-23 | STEAM BOILERS (Operation, maintenance and troubleshooting) | Rp5,500,000 |
21-23 | Electric Power Transformer and Motor (Operation, Maintenance and Trouble Shooting) | Rp5,500,000 |
22-24 | DYNAMIC PUMPS (Operation, Maintenance and Trouble Shooting) | Rp5,500,000 |
22-24 | Lightning Protection and Grounding Systems | Rp5,500,000 |
23-24 | Electrical Safety System | Rp4,000,000 |
23-24 | Diesel Electrical Set Operation and Maintenance | Rp4,000,000 |
23-24 | Keselamatan dan Kesehatan Kerja (K3) Listrik | Rp4,000,000 |
29-30 | Implementasi SCADApada Instalasi Industri | Rp4,000,000 |
29-30 | Electrical Diesel Generator (Operation And Maintenance) | Rp4,000,000 |
SUPPLY CHAIN | ||
Tanggal | Judul Training | Harga |
1-2 | RFID in Warehouse | Rp4,000,000 |
7-8 | Basic of Purchasing Management | Rp3,700,000 |
7-8 | Manajemen Transportasi | Rp4,000,000 |
9-10 | Fundamental of Supply Chain Management & Logistic | Rp3,700,000 |
9-10 | Driver Management | Rp4,000,000 |
9-10 | Dispatch Management System | Rp4,000,000 |
14-15 | Reverse Logistics | Rp4,000,000 |
14-15 | Vendor Management Inventory | Rp4,000,000 |
14-15 | Continous Improvement Supply Chain dengan Simulasi Promodel | Rp4,000,000 |
16-17 | Basic of Inventory Management & Warehouse Management | Rp3,700,000 |
16-17 | Effective Inventory Reduction | Rp4,000,000 |
16-17 | Competitor Market Analysis | Rp4,000,000 |
21-22 | Owner Estimate Technique | Rp4,000,000 |
21-22 | Production Planning and Inventory Control (PPIC) | Rp4,000,000 |
23-24 | Supplier Market Analysis | Rp3,700,000 |
23-24 | Vendor Analysis and Selection | Rp4,000,000 |
28-29 | Spare Part Management | Rp4,000,000 |
29-30 | Negotiation Skills | Rp4,000,000 |
29-30 | Change Management in SCM | Rp4,000,000 |
HEALTH, SAFETY & ENVIRONTMENT | ||
Tanggal | Judul Training | Harga |
2-3 | Implementasi OHSAS 18001:2007 | Rp3,700,000 |
9-10 | Dokumentasi OHSAS 18001:2007 | Rp3,700,000 |
14-15 | Audit Internal OHSAS 18001:2007 | Rp3,700,000 |
1-2 | Implementasi ISO 14001:2015 | Rp3,700,000 |
7-8 | Dokumentasi ISO 14001:2015 | Rp3,700,000 |
9-10 | Internal Audit ISO 14001:2015 | Rp3,700,000 |
9-10 | Pengendalian Bahan Beracun Berbahaya (B3) | Rp4,000,000 |
23-24 | Teknik Penyusunan AMDAL | Rp4,000,000 |
16-17 | Teknik Instalasi Pengolahan Air Limbah (IPAL) | Rp4,000,000 |
23-24 | Industrial Disaster & Emergency Response | Rp4,000,000 |
16-17 | Teknik Penyusunan dan Pemahaman MSDS | Rp4,000,000 |
7-8 | Green Building and Factory | Rp4,000,000 |
14-15 | Implementasi Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3 - PP No 50 Tahun 2012) | Rp3,700,000 |
21-22 | Implementasi ISO 14064:2006 (Perhitungan dan Penurunan Emisi Gas Rumah Kaca) | Rp4,000,000 |
23-24 | Risk Assessment (Analisa Resiko) & JSA (Job Safety Analysis) | Rp4,000,000 |
9-10 | Incident Investigation | Rp4,000,000 |
23-24 | Behaviour Safety | Rp4,000,000 |
7-8 | Teknik Penanganan Kondisi Tanggap darurat | Rp4,000,000 |
28-29 | Hazard Operational (HAZOP) | Rp4,000,000 |
29-30 | Process Hazard Analysis Leader | Rp4,000,000 |
23-24 | Hazard Communication | Rp4,000,000 |
1-2 | Persiapan Audit Lingkungan (PROPER) | Rp4,000,000 |
7-8 | Pengelolaan Limbah Biologis | Rp4,000,000 |
2-3 | Pengelolaan Limbah Industri | Rp4,000,000 |
15-16 | Ergonomic In Workplace | Rp3,700,000 |
FINANCE | ||
Tanggal | Judul Training | Harga |
7-8 | Financial Planning & Decision Making | Rp3,700,000 |
9-10 | Finance for Non Finance | Rp3,700,000 |
14-15 | Budgeting and Project Cost Control | Rp3,700,000 |
16-17 | Activity Based Costing | Rp3,700,000 |
21-22 | Cash Management | Rp3,700,000 |
23-24 | Export Import | Rp3,700,000 |
29-30 | Advanced Budgeting and Cost Control | Rp3,700,000 |
MARKETING | ||
Tanggal | Judul Training | Harga |
9-10 | Customer Satisfaction Survey (Methodology & Statistic) | Rp4,500,000 |
16-17 | "Advance Statistical Analysis For Marketing Research Using R | |
(Open Source Software)" | Rp4,500,000 | |
21-22 | Marketing Research with SPSS | Rp4,500,000 |
23-24 | Marketing Research with MS Excel | Rp4,500,000 |
HRD | ||
Tanggal | Judul Training | Harga |
7-8 | HR Management Based Competency | Rp3,800,000 |
7-8 | Performance Management and Appraisal | Rp3,800,000 |
7-8 | Program Persiapan Pensiun | Rp3,800,000 |
9-10 | Competency Based Recruitment & Selection | Rp3,800,000 |
9-10 | Training Need Analysis | Rp3,800,000 |
14-15 | HR for Non HR | Rp3,800,000 |
16-17 | Handling Customer Complaint | Rp3,800,000 |
16-17 | Human Capital Return on Investment | Rp3,800,000 |
21-22 | Effective Customer Relationship Management (CRM) | Rp3,800,000 |
21-22 | Corporate Social Responsibility (CSR) | Rp3,800,000 |
21-22 | Hukum Ketenagakerjaan | Rp3,800,000 |
22-23 | Work Load Analysis | Rp3,800,000 |
23-24 | Statistical Performance Control for Employee | Rp3,800,000 |
28-29 | Fast Track To Be A Super Supervisor | Rp3,800,000 |
29-30 | Design & Evaluation of Training Program | Rp3,800,000 |
MINING, OIL & GAS | ||
Tanggal | Judul Training | Harga |
1-2 | Teknologi Gasifikasi Batubara dan Penerapannya | Rp5,000,000 |
2-3 | Teknologi Pemanfaatan Batubara untuk PLTU | Rp5,000,000 |
7-8 | Teknik Preparasi, Pengujian dan Analisis Batubara | Rp5,000,000 |
9-10 | Coal Preparation Plant & Stockpile Management | Rp5,000,000 |
21-22 | Teknologi Upgrading Batubara | Rp5,000,000 |
22-24 | Pengenalan Proses Preparasi Analisis Bahan Galian Industri dan Bahan Galian Logam | Rp5,500,000 |
23-24 | Teknologi Batubara Bersih | Rp5,000,000 |
FOOD & AGRICULTURE | ||
Tanggal | Judul Training | Harga |
7-8 | Good Manufacturing Practice: Cara Pengolahan Pangan yang Baik | Rp3,700,000 |
9-10 | Implementasi ISO 22000:2005 | Rp3,700,000 |
9-10 | Food Safety (HACCP) For Hotel, Restaurant & Catering | Rp4,000,000 |
14-15 | Dokumentasi ISO 22000:2005 | Rp3,700,000 |
16-17 | Internal Audit ISO 22000:2005 | Rp3,700,000 |
16-17 | Pelatihan Operator Pertanian Organik | Rp3,700,000 |
16-17 | GAP & GHP (Good Agriculture Practice & Good Handling Practice) | Rp4,000,000 |
23-24 | Penentuan Kadaluarsa Produk Pangan | Rp3,700,000 |
CIVIL & CONTRUCTION | ||
Tanggal | Judul Training | Harga |
1-2 | Pelaksanaan dan Pemeliharaan Jembatan | Rp4,500,000 |
8-9 | Pelaksanaan dan Pengendalian Mutu Pekerjaan Timbunan Badan Jalan | Rp4,500,000 |
23-24 | Pelaksanaan dan Pengendalian Mutu Pekerjaan Perkerasan Jalan Lentur (Flexible Pavement) | Rp4,500,000 |
28-29 | Pengendalian Mutu Pekerjaan Beton Semen dan Perencanaan Campuran (Mix Design) | Rp4,500,000 |
Pelatihan Karyawan, Pelatihan Manajemen, Manajemen Pelatihan, Pelatihan Leadership, Materi Training, Lembaga Pelatihan, Lembaga Training, Training Hrd, Informasi Training, Jadwal Training, Pelatihan Hrd, Jadwal Pelatihan, Training Hr, Pelatihan Management, Training Untuk Hrd
Kamis, 11 Februari 2016
Jadwal Training Bulan Juni 2016
Langganan:
Posting Komentar (Atom)
Tidak ada komentar:
Posting Komentar